亚洲精品久久久久久一本婷婷_亚洲天堂无码免费观看_高清画质让您沉浸于绝美的视听盛宴_四虎永久在线高国产精品_亚洲一区二区三区乱子伦_精品亚洲国产品香蕉在线_gogogo免费观看国语_久久久无码亚洲精品日韩京东小说_手机无码视频在线免费观看不卡

Contact Us

Blower Fan check start

Date: 2016-5-31   Click: 1617 Times

Check to make sure the fan is to start, press the start button, "Blower Fan" into the start procedure: ① auxiliary pump pre-lubricated one minute (auxiliary pump operation the green light). ② "Blower Fan" to start the operation (blower running green light). ③ relief valve was slowly closed (pressure relief valve green light is off, two minutes after the pressure relief valve is closed green light). ④ auxiliary pump is stopped (auxiliary pump operation indicator is off, stop the red light). So far, the blower starts successfully, it can be put into formal operation. ⑤ After such press the start button, "Blower Fan" failed to start as scheduled, the low oil pressure alarm one minute after the red light, the entire start-up process is stopped. Determine the cause is resolved, restart eliminate the alarm.

Back to: Industry news

+86-0769-83660708

Home Product News Contact